Cogeneration output
2 MW
Two parallel biogas units
Konin – 2 MW cogeneration plant connected to the MV network to support local renewable generation.
We delivered an execution design that enables safe export of electricity and heat from biogas while strengthening the site’s energy independence.
Location

Cogeneration output
2 MW
Two parallel biogas units
Energy source
Biogas
Combined heat and power production
Grid interface
MV network
Cable line and container substation design
Project scope
Execution design
Documentation, coordination and grid approvals
Case study • Biogas cogeneration
Deliver a safe, standards-compliant connection of the Konin biogas CHP plant to the medium-voltage grid.
The design integrates two CHP units, optimises biogas utilisation and supports local renewable generation.
Project footprint
Case study • Biogas cogeneration
The project had to satisfy strict technical and formal conditions for MV connection.
Nivato solution
We prepared comprehensive execution documentation and managed stakeholder approvals at every stage.
The container substation needed to fit the existing land use while ensuring operational safety.
Nivato solution
Detailed land-access studies led to a layout that minimises site impact and supports safe operation.
Synchronising two biogas CHP engines required precise alignment with grid parameters.
Nivato solution
We designed control and protection schemes that maintain stable export conditions.
Case study • Biogas cogeneration
Case study • Biogas cogeneration
Thorough connection design underpins reliable operation of biogas-based CHP systems.
Talk to Nivato about designing your biogas CHP grid connection.