PV capacity
≈700 kW
On-site solar generation for energy-intensive processes
Manufacturing plant in Kepno – 700 kW PV, battery storage and a modernised power backbone for greater energy independence.
The project increased resilience to energy price volatility, optimised operating costs and delivered full control over production, storage and consumption.
Location

PV capacity
≈700 kW
On-site solar generation for energy-intensive processes
Battery storage
ESS
Stabilises supply and captures surplus generation
Transformer station
15/0.4 kV
Reliable power distribution for the entire facility
Modernisation scope
6 workstreams
From technical analysis to integrated energy management
Case study • Energy modernisation
Deliver energy independence for the Kepno plant by integrating PV, battery storage and upgraded MV infrastructure.
The client needed uninterrupted production while optimising energy costs and maximising renewable self-consumption.
Project footprint
Case study • Energy modernisation
The upgrade had to coexist with operational power and automation systems.
Nivato solution
We prepared a detailed integration roadmap and staged testing to ensure a seamless rollout.
The client expected continuous production throughout the modernisation.
Nivato solution
Work took place in coordinated maintenance windows supported by temporary power supplies.
PV, battery storage and MV infrastructure needed to operate as one intelligent system.
Nivato solution
Advanced control algorithms and real-time monitoring balance energy flows to match plant demand.
Case study • Energy modernisation
Case study • Energy modernisation
Comprehensive energy upgrades help manufacturers combine operational reliability with measurable savings.
Talk to Nivato about modernising your plant’s energy infrastructure.
Have a question, want a quote or report an incident? Choose your form.
Contact available only in Polish and English.