Comprehensive delivery of a solar farm: design, prefabrication, installation and a 15 kV grid connection in Brzeziny near Uniejów.
The project boosts solar generation in the region, reducing CO₂ emissions and supporting Poland’s energy transition.
Location

Installed capacity
699.75 kWp
Total peak power of PV modules
Grid connection
15 kV MV
Transformer substation and connection to the DSO network
Documentation
Design & approvals
Complete design package accepted by the operator
Monitoring
Online system
Continuous performance supervision for the PV plant
Case study • Solar power
Increase the share of solar energy in the local grid while cutting CO₂ emissions.
The investment covered design, installation and grid integration so the PV plant can safely export energy to the network.
Project footprint
Case study • Solar power
Documentation and schedules had to match operator requirements.
Nivato solution
We maintained continuous communication with the DSO and secured approvals before construction began.
The PV plant needed to perform reliably despite weather variability.
Nivato solution
We chose high-efficiency modules and durable structures, mapping installation stages to avoid delays.
Electrical prefabs had to be ready as field works progressed.
Nivato solution
Modular prefabrication and controlled deliveries shortened installation time on site.
Case study • Solar power
Case study • Solar power
Successful PV deployments depend on reliable documentation, precise installation and ongoing supervision.
Let’s build your PV farm
Have a question, want a quote or report an incident? Choose your form.
Contact available only in Polish and English.