Total capacity
30 MW
Enough clean power for tens of thousands of households
Complete rollout of 15 wind turbines rated at 2 MW across four Polish locations – Kalisz, Krotoszyn, Jarocin and Pępowo.
The project increases the share of green energy in the national grid and sets a benchmark for future renewable investments.
Locations

Total capacity
30 MW
Enough clean power for tens of thousands of households
Turbines
15 × 2 MW
Complete installation, testing and commissioning
Locations
4 sites
Kalisz • Krotoszyn • Jarocin • Pępowo
Integration
100%
Seamless tie-in with the existing power infrastructure
Case study • Wind energy
Deliver fully operational wind farms in four locations while integrating them with the existing power network.
Each of the 15 turbines had to supply 2 MW of stable output and meet stringent safety standards and DSO requirements.
Project footprint
Case study • Wind energy
Parallel work in Kalisz, Krotoszyn, Jarocin and Pępowo required synchronised teams, deliveries and schedules.
Solution
We introduced parallel timelines, daily progress monitoring and a shared reporting dashboard for all crews.
Blades and tower sections had to reach remote locations on time and without damage.
Solution
Specialised heavy-transport equipment and high-capacity cranes were deployed, with routes planned alongside local authorities.
Working at height and in variable weather demanded strict adherence to procedures.
Solution
Extended HSE instructions, multi-stage checklists and on-site quality coordinators safeguarded every installation.
Case study • Wind energy
Case study • Wind energy
The rollout proves that successful wind farm projects blend engineering experience, logistics expertise and uncompromising quality control.